mirror of
https://github.com/SamyRai/turash.git
synced 2025-12-26 23:01:33 +00:00
- Reorganized funding program structure: moved standalone .md files into organized directories with PROGRAM_INFO.md and APPLICATION_SCOPE.md - Created budget files for selected priority programs: * EIC Accelerator: budget_breakdown.csv and budget_justification.md (€1.815M) * ZIM: budget_breakdown.csv and budget_justification.md (€465k) * DBU: budget_breakdown.csv and budget_justification.md (€152.5k) * LIFE Programme: budget_breakdown.csv and budget_justification.md (€1.815M) - Created team CV files for all selected programs (CV_Damir_Mukimov.md) - Added application documents structure: * funding/applications/budget/ - Master budget files and templates * funding/applications/team_cvs/ - Master CV and team expertise summary - Updated FUNDING_GAP_ANALYSIS.md to reflect completed documents - Added APPLICATION_REQUIREMENTS_REPORT.md with detailed requirements - Added PREPARATION_PRIORITY.md for application preparation workflow
317 lines
14 KiB
Markdown
317 lines
14 KiB
Markdown
# ZIM Application Scope
|
|
|
|
**Program:** Central Innovation Programme for SMEs (ZIM)
|
|
**Application Type:** Single Company R&D Project
|
|
**Grant Requested:** €465,000 (60% of €775,000 total project)
|
|
**Timeline:** 6 months (Months 1-6)
|
|
**Berlin Bonus:** Eligible for +10% (up to €542,000 grant)
|
|
|
|
---
|
|
|
|
## 🎯 Application Summary
|
|
|
|
**City Resource Graph** applies to **ZIM** for a **€465k grant** to execute the MVP+ phase, developing advanced graph algorithms and industrial integrations for multi-resource symbiosis optimization.
|
|
|
|
**Key Innovation:**
|
|
- High-risk R&D in graph-based industrial optimization
|
|
- Novel multi-criteria resource matching algorithms
|
|
- Automated industrial system integrations
|
|
- Technical breakthrough in circular economy implementation
|
|
|
|
---
|
|
|
|
## 📋 Project Scope & R&D Focus
|
|
|
|
### Phase 1: Core R&D Development (Months 1-3)
|
|
**Budget:** €232k | **Focus:** Algorithm innovation and integration protocols
|
|
|
|
**R&D Deliverables:**
|
|
- ✅ **Graph Algorithm Enhancement**: Multi-criteria optimization for resource matching
|
|
- ✅ **Industrial Integration Framework**: Standardized protocols for ERP/SCADA systems
|
|
- ✅ **Economic Calculation Engine**: Real-time NPV/IRR calculations for symbiosis opportunities
|
|
- ✅ **Multi-Resource Plugin Architecture**: Heat, water, waste, and material flow optimization
|
|
|
|
**Technical Innovation:**
|
|
- Advanced graph traversal algorithms for complex industrial relationships
|
|
- Machine learning integration for predictive resource flow optimization
|
|
- Real-time constraint optimization for multi-party resource exchanges
|
|
- Automated regulatory compliance checking for industrial symbiosis
|
|
|
|
### Phase 2: Validation & Optimization (Months 4-6)
|
|
**Budget:** €233k | **Focus:** Technical validation and performance optimization
|
|
|
|
**R&D Deliverables:**
|
|
- ✅ **Performance Optimization**: Algorithm scaling for 1,000+ business networks
|
|
- ✅ **Integration Testing**: Real industrial system compatibility validation
|
|
- ✅ **Data Quality Framework**: Automated validation for industrial IoT data streams
|
|
- ✅ **User Experience Refinement**: Industrial operator interface optimization
|
|
|
|
**Technical Validation:**
|
|
- Algorithm accuracy testing against industrial benchmarks
|
|
- Integration reliability testing with SAP, Oracle, and SCADA systems
|
|
- Performance benchmarking for real-time optimization requirements
|
|
- User acceptance testing with Berlin industrial partners
|
|
|
|
---
|
|
|
|
## 💰 Budget Breakdown
|
|
|
|
**Total Project Cost:** €775,000
|
|
**Grant Requested:** €465,000 (60% funding rate)
|
|
**Own Contribution:** €310,000 (40%)
|
|
**Potential Berlin Bonus:** +10% = €542,000 grant
|
|
|
|
| Category | Amount (€) | % | R&D Justification |
|
|
|----------|------------|----|-------------------|
|
|
| **Personnel** | 276,000 | 59.4% | Technical R&D team for algorithm development |
|
|
| **Infrastructure** | 32,000 | 6.9% | Cloud resources for testing and development |
|
|
| **Subcontracting** | 45,000 | 9.7% | Specialized industrial integration consulting |
|
|
| **Travel** | 25,000 | 5.4% | Technical conferences, partner meetings |
|
|
| **Marketing** | 66,000 | 14.2% | Market validation of technical innovations |
|
|
| **Other** | 21,000 | 4.5% | Testing equipment, development tools |
|
|
| **TOTAL** | **465,000** | **100%** | |
|
|
|
|
**Funding Rate:** 60% (Berlin SME) + potential 10% bonus = 70%
|
|
|
|
---
|
|
|
|
## 🎖️ ZIM Fit & Innovation Level
|
|
|
|
### Technical Innovation Requirements
|
|
- ✅ **High Technical Risk**: Graph algorithms for industrial optimization
|
|
- ✅ **R&D Component**: Algorithm development and system integration
|
|
- ✅ **Innovation Level**: Breakthrough in industrial digital transformation
|
|
- ✅ **Industrial Application**: Real manufacturing and industrial use cases
|
|
|
|
### SME & Regional Requirements
|
|
- ✅ **German SME**: Glowing Pixels UG (<500 FTE)
|
|
- ✅ **Berlin Location**: Eligible for +10% eastern region bonus
|
|
- ✅ **Innovation Capacity**: Strong technical team with industrial expertise
|
|
- ✅ **Market Focus**: EU industrial sector (€500B market opportunity)
|
|
|
|
### Project Requirements
|
|
- ✅ **Clear R&D Focus**: Algorithm and integration protocol development
|
|
- ✅ **Technical Feasibility**: MVP foundation already demonstrated
|
|
- ✅ **Economic Viability**: Clear commercialization path post-R&D
|
|
- ✅ **Market Potential**: Addressable industrial efficiency market
|
|
|
|
---
|
|
|
|
## 📊 R&D Innovation Metrics
|
|
|
|
### Algorithm Innovation
|
|
- **Complexity Level**: High (multi-objective graph optimization)
|
|
- **Technical Risk**: High (novel industrial application)
|
|
- **Innovation Type**: Breakthrough (graph-based industrial optimization)
|
|
- **Validation Method**: Industrial pilot testing and performance benchmarking
|
|
|
|
### Integration Innovation
|
|
- **System Complexity**: High (SAP, Oracle, SCADA compatibility)
|
|
- **Protocol Standardization**: Novel industrial IoT integration framework
|
|
- **Data Quality**: Automated validation for industrial sensor data
|
|
- **Scalability**: Framework designed for 1,000+ industrial installations
|
|
|
|
### Performance Innovation
|
|
- **Real-time Processing**: Sub-second optimization for live industrial processes
|
|
- **Accuracy Requirements**: >90% matching accuracy for resource flows
|
|
- **Scalability Targets**: Support for metropolitan industrial networks
|
|
- **Reliability Standards**: 99.9% uptime for industrial operations
|
|
|
|
---
|
|
|
|
## 🔄 Application Timeline
|
|
|
|
### Application Preparation (Q4 2025)
|
|
- **Technical Documentation**: R&D methodology and innovation description
|
|
- **Budget Calculation**: Model-based cost breakdown and justification
|
|
- **Market Analysis**: Industrial sector adoption potential documentation
|
|
- **Team Profiles**: Technical expertise and R&D capability demonstration
|
|
|
|
### Application Submission (Q4 2025 - Q1 2026)
|
|
- **Rolling Deadline**: **Submit anytime** through ZIM portal (fully digital process)
|
|
- **Evaluation Period**: **~3 months** from submission
|
|
- **Decision Timeline**: **3-4 months** total process
|
|
- **Grant Start**: Immediate upon approval (electronic approval system active)
|
|
- **Application Portal**: [ZIM Formularcenter](https://www.zim.de/ZIM/Navigation/DE/Formularcenter/formularcenter.html)
|
|
|
|
### Project Execution (Q1 2026 - Q2 2026)
|
|
- **Monthly Reporting**: Technical progress and R&D milestone tracking
|
|
- **Quality Assurance**: Independent R&D validation and testing
|
|
- **Final Evaluation**: Technical achievement assessment and documentation
|
|
|
|
---
|
|
|
|
## 🎯 Success Criteria
|
|
|
|
### Technical R&D Success
|
|
- Multi-resource matching algorithms operational and validated
|
|
- Industrial system integrations functional with major ERP platforms
|
|
- Performance benchmarks met (>90% accuracy, <2s response time)
|
|
- Algorithm scalability demonstrated for 1,000+ business networks
|
|
|
|
### Innovation Demonstration Success
|
|
- Technical breakthroughs documented and peer-reviewed
|
|
- R&D methodology validated through industrial pilot testing
|
|
- Innovation level confirmed through independent evaluation
|
|
- IP protection strategy implemented for key algorithms
|
|
|
|
### Business Validation Success
|
|
- Industrial partner feedback collected and analyzed
|
|
- Market adoption indicators measured and tracked
|
|
- Revenue model validated through pilot transactions
|
|
- Commercialization path clearly demonstrated
|
|
|
|
---
|
|
|
|
## 📋 Application Documents
|
|
|
|
### Completed ✅
|
|
- [x] **Company registration** (German UG, Berlin address)
|
|
- [x] **SME status confirmation** (<500 FTE, independent)
|
|
- [x] **Technical project description** (R&D focus, innovation level)
|
|
- [x] **Market analysis** (€500B EU industrial resource market)
|
|
- [x] **Team CVs** (CTO + technical team expertise)
|
|
- [x] **Budget breakdown** (Model-calculated €465k grant request)
|
|
|
|
### R&D Specific Documentation 📝
|
|
- [x] **R&D plan** (6-month technical development roadmap)
|
|
- [x] **Innovation description** (Technical breakthroughs, risk levels)
|
|
- [x] **Technical feasibility** (Algorithm validation, integration testing)
|
|
- [x] **Risk assessment** (Technical challenges, mitigation strategies)
|
|
- [x] **IP strategy** (Patent potential, protection plans)
|
|
- [x] **Commercialization plan** (Post-R&D market entry strategy)
|
|
|
|
---
|
|
|
|
## 🚀 Competitive Advantages
|
|
|
|
### Technical Excellence
|
|
- **Algorithm Innovation**: Breakthrough graph-based optimization
|
|
- **Industrial Expertise**: Deep manufacturing process knowledge
|
|
- **Integration Capability**: Multi-platform industrial system compatibility
|
|
- **Performance Focus**: Real-time optimization for industrial operations
|
|
|
|
### Regional Benefits
|
|
- **Berlin Location**: +10% funding bonus eligibility
|
|
- **EU Market Access**: Positioned for European industrial transformation
|
|
- **Network Effects**: Berlin industrial ecosystem partnerships
|
|
- **Research Access**: Proximity to technical universities and research institutes
|
|
|
|
### Program Fit
|
|
- **R&D Focus**: Strong emphasis on technical innovation
|
|
- **SME Support**: Designed for small companies with big ideas
|
|
- **Fast Evaluation**: 3-month decision timeline
|
|
- **Flexible Timing**: Rolling application process
|
|
|
|
---
|
|
|
|
## 💡 ZIM-Specific Strategies
|
|
|
|
### Bonus Optimization
|
|
- **Berlin Bonus**: Document eastern region economic benefits
|
|
- **International Collaboration**: Explore +10% for foreign SME partnerships
|
|
- **Research Partnerships**: Consider university collaborations for additional bonuses
|
|
|
|
### R&D Documentation
|
|
- **Technical Risk Emphasis**: Highlight algorithm complexity and innovation level
|
|
- **Industrial Validation**: Demonstrate real manufacturing application potential
|
|
- **Scalability Proof**: Show framework designed for national industrial networks
|
|
- **Economic Impact**: Quantify potential industrial efficiency gains
|
|
|
|
### Evaluation Preparation
|
|
- **Technical Review**: Prepare for algorithm and integration technical assessment
|
|
- **Market Validation**: Document industrial partner interest and pilot results
|
|
- **Financial Viability**: Demonstrate clear path from R&D to commercialization
|
|
- **SME Credibility**: Showcase technical team capability and track record
|
|
|
|
---
|
|
|
|
## 📚 Context & Best Practices
|
|
|
|
### ZIM Program Characteristics
|
|
|
|
#### Funding Rates & Bonuses
|
|
- **Base Rate**: 60% for Berlin SMEs (<500 FTE)
|
|
- **Berlin Bonus**: +10% (eastern region) = **70% maximum funding**
|
|
- **International Bonus**: +10% for foreign SME partnerships
|
|
- **Maximum Grant**: €690,000 for single-company projects
|
|
- **Our Request**: €465k (67% of maximum, conservative approach)
|
|
|
|
#### Application Process
|
|
- **Fully Digital**: Electronic application and approval system (new in 2025)
|
|
- **No Deadlines**: Rolling application process, submit anytime
|
|
- **Fast Evaluation**: 3-month evaluation timeline (industry-leading speed)
|
|
- **Support Available**: ZIM webinars and consulting hours available
|
|
|
|
### Similar R&D Projects
|
|
|
|
#### SPIRE-SAIS Project (Skills for Industrial Symbiosis)
|
|
- **Reference**: Cross-sectoral blueprint for sustainable process industry
|
|
- **Lesson**: R&D focus on industrial symbiosis skills and methodologies
|
|
- **Application**: Our algorithm development creates reusable R&D framework
|
|
- **Source**: [SPIRE-SAIS](https://www.cedefop.europa.eu/en/project-fiches/spire-sais-skills-alliance-industrial-symbiosis-sais-cross-sectoral-blueprint-sustainable-process)
|
|
|
|
#### EPOS Project (European Process Industry)
|
|
- **Reference**: Industrial symbiosis across steel, cement, chemicals, minerals
|
|
- **Lesson**: Cross-sectorial collaboration requires technical innovation
|
|
- **Application**: Our platform enables multi-sector industrial symbiosis
|
|
- **Source**: European industrial symbiosis best practices
|
|
|
|
### ZIM Evaluation Criteria
|
|
|
|
#### R&D Innovation (Primary Focus)
|
|
- **Technical Risk**: ✅ HIGH (graph algorithms, industrial optimization)
|
|
- **Innovation Level**: ✅ BREAKTHROUGH (novel industrial application)
|
|
- **Feasibility**: ✅ VALIDATED (MVP foundation exists)
|
|
- **Market Potential**: ✅ SIGNIFICANT (€500B EU market)
|
|
|
|
#### SME Requirements
|
|
- **Company Size**: ✅ <500 FTE (Glowing Pixels UG)
|
|
- **German Location**: ✅ Berlin-based (eligible for eastern bonus)
|
|
- **Innovation Capacity**: ✅ Strong technical team
|
|
- **Commercialization**: ✅ Clear path post-R&D
|
|
|
|
### Application Tips from ZIM Experts
|
|
|
|
1. **R&D Documentation**:
|
|
- Clearly separate R&D activities from commercialization
|
|
- Highlight technical risk and innovation level
|
|
- Document algorithm development and integration protocols
|
|
- Include performance benchmarks and validation methodology
|
|
|
|
2. **Budget Justification**:
|
|
- Personnel costs aligned with R&D activities
|
|
- Infrastructure costs for testing and development
|
|
- Subcontracting for specialized industrial expertise
|
|
- Marketing limited to R&D validation (not customer acquisition)
|
|
|
|
3. **Berlin Bonus Maximization**:
|
|
- Document Berlin industrial ecosystem engagement
|
|
- Highlight eastern region economic development impact
|
|
- Demonstrate Berlin-specific R&D partnerships
|
|
- Show Berlin market validation potential
|
|
|
|
4. **Success Factors**:
|
|
- **High technical risk**: ✅ Algorithm complexity
|
|
- **Clear R&D component**: ✅ Platform development
|
|
- **Industrial application**: ✅ Real manufacturing use cases
|
|
- **Economic viability**: ✅ Commercialization path
|
|
|
|
### Official Resources
|
|
|
|
- **ZIM Official Site**: [www.zim.de](https://www.zim.de/ZIM/Navigation/DE/Home/home.html)
|
|
- **ZIM Application Portal**: [Formularcenter](https://www.zim.de/ZIM/Navigation/DE/Formularcenter/formularcenter.html)
|
|
- **ZIM Webinars**: Regular webinars on application process and requirements
|
|
- **ZIM Consulting**: Direct contact with project managers for guidance
|
|
- **ZIM Success Examples**: [Erfolgsbeispiele](https://www.zim.de/ZIM/Navigation/DE/Infothek/Erfolgsbeispiele/erfolgsbeispiele.html)
|
|
|
|
---
|
|
|
|
**Application Confidence:** HIGH
|
|
**Technical Innovation Level:** ADVANCED
|
|
**R&D Risk Level:** MANAGED
|
|
**Berlin Bonus Potential:** €77,000 additional funding
|
|
|
|
*This ZIM application leverages our technical strengths for maximum R&D impact while optimizing regional funding advantages.*
|
|
|