mirror of
https://github.com/SamyRai/turash.git
synced 2025-12-26 23:01:33 +00:00
- Initialize git repository - Add comprehensive .gitignore for Go projects - Install golangci-lint v2.6.0 (latest v2) globally - Configure .golangci.yml with appropriate linters and formatters - Fix all formatting issues (gofmt) - Fix all errcheck issues (unchecked errors) - Adjust complexity threshold for validation functions - All checks passing: build, test, vet, lint
401 lines
15 KiB
Markdown
401 lines
15 KiB
Markdown
# Funding Application Gap Analysis
|
|
|
|
## Overview
|
|
This document identifies gaps between **funding application requirements** (from `COMMON_REQUIREMENTS.md`) and **existing project documentation** in the `concept/` directory. Use this to identify what needs to be prepared for funding applications.
|
|
|
|
---
|
|
|
|
## ✅ DOCUMENTED - Ready for Funding Applications
|
|
|
|
### 1. ✅ Project Description (100% Required)
|
|
**Status**: ✅ **COMPREHENSIVE** - Well documented
|
|
- **Location**: Multiple files covering all aspects
|
|
- **Technical Details**: `03_core_concept_resource-matching_engine.md`, `10_matching_engine_core_algorithm.md`
|
|
- **Innovation Focus**: Extensive documentation on graph-based matching, industrial symbiosis
|
|
- **Project Scope**: `00_introduction.md`, `05_system_overview.md`
|
|
- **Gap**: None - comprehensive project description exists
|
|
|
|
**Files**:
|
|
- `00_introduction.md` - Executive summary
|
|
- `03_core_concept_resource-matching_engine.md` - Core innovation
|
|
- `05_system_overview.md` - System overview
|
|
- `10_matching_engine_core_algorithm.md` - Technical innovation
|
|
- Multiple technical architecture files
|
|
|
|
---
|
|
|
|
### 2. ✅ Budget Breakdown (100% Required)
|
|
**Status**: ✅ **DOCUMENTED** - Detailed budget in roadmap
|
|
- **Location**: `28_project_roadmap.md`
|
|
- **Details**:
|
|
- Total: €2.5M seed funding
|
|
- Phase 1 (Months 1-3): €400k
|
|
- Phase 2 (Months 4-6): Detailed breakdown
|
|
- Infrastructure costs per month detailed
|
|
- Team costs (8 engineers, 2 domain experts, 1 BD)
|
|
- **Gap**: May need more granular Excel template format for funding applications
|
|
|
|
**Files**:
|
|
- `28_project_roadmap.md` - Detailed budget by phase
|
|
- `monetisation/financial-projections.md` - Cost structure (Year 1-3)
|
|
|
|
**Action Needed**: Create Excel budget template with line items (personnel, equipment, subcontracting, travel, etc.)
|
|
|
|
---
|
|
|
|
### 3. ✅ Market Analysis (86% Required)
|
|
**Status**: ✅ **COMPREHENSIVE** - Excellent coverage
|
|
- **Location**: `01_market_analysis.md`
|
|
- **Details**:
|
|
- TAM/SAM/SOM analysis
|
|
- Target customer segments
|
|
- Geographic focus
|
|
- Competitive landscape
|
|
- Market validation framework
|
|
- **Gap**: None - comprehensive market analysis exists
|
|
|
|
**Files**:
|
|
- `01_market_analysis.md` - Complete market analysis
|
|
- `02_competitive_analysis.md` - Competitive landscape
|
|
- `monetisation/competitive-analysis.md` - Detailed competitive analysis
|
|
|
|
---
|
|
|
|
### 4. ✅ Business Plan (86% Required)
|
|
**Status**: ✅ **WELL DOCUMENTED** - Comprehensive business model
|
|
- **Location**: `monetisation/` directory
|
|
- **Details**:
|
|
- Revenue model (`revenue-model.md`)
|
|
- Pricing strategy (`pricing-strategy.md`)
|
|
- Go-to-market strategy (`go-to-market.md`)
|
|
- Financial projections (`financial-projections.md`)
|
|
- Unit economics (LTV/CAC)
|
|
- **Gap**: May need consolidated single document format for some applications
|
|
|
|
**Files**:
|
|
- `22_output_monetization.md` - Overview (references monetisation/)
|
|
- `monetisation/revenue-model.md` - Revenue streams
|
|
- `monetisation/financial-projections.md` - Financial model
|
|
- `monetisation/go-to-market.md` - Market strategy
|
|
|
|
**Action Needed**: Create single consolidated business plan document (10-20 pages) pulling from all sources
|
|
|
|
---
|
|
|
|
### 5. ✅ Project Timeline & Milestones (86% Required)
|
|
**Status**: ✅ **DETAILED** - Comprehensive roadmap
|
|
- **Location**: `28_project_roadmap.md`
|
|
- **Details**:
|
|
- 18-month roadmap with monthly milestones
|
|
- Phase-by-phase breakdown
|
|
- Deliverables per milestone
|
|
- Success metrics
|
|
- Technical dependencies
|
|
- **Gap**: None - detailed timeline exists
|
|
|
|
**Files**:
|
|
- `28_project_roadmap.md` - 18-month detailed roadmap
|
|
- `24_prototype_roadmap.md` - High-level phases
|
|
- `monetisation/implementation-roadmap.md` - Business implementation timeline
|
|
|
|
**Action Needed**: Create Gantt chart visualization for funding applications
|
|
|
|
---
|
|
|
|
### 6. ✅ Innovation Documentation (100% Required)
|
|
**Status**: ✅ **EXTENSIVE** - Well documented
|
|
- **Location**: Multiple technical files
|
|
- **Details**:
|
|
- Graph-based matching engine innovation
|
|
- Multi-resource matching algorithm
|
|
- Hybrid Neo4j + PostGIS architecture
|
|
- Technical novelty clearly described
|
|
- Technology readiness level (TRL 5-8 mentioned)
|
|
- **Gap**: May need formal TRL assessment document
|
|
|
|
**Files**:
|
|
- `03_core_concept_resource-matching_engine.md` - Core innovation
|
|
- `10_matching_engine_core_algorithm.md` - Algorithm details
|
|
- `09_graph_database_design.md` - Technical innovation
|
|
- `11_technical_architecture_implementation.md` - Implementation details
|
|
|
|
**Action Needed**: Create formal TRL (Technology Readiness Level) assessment document (currently TRL 5-8 range, need specific assessment)
|
|
|
|
---
|
|
|
|
### 7. ✅ Financial Projections (50% Required)
|
|
**Status**: ✅ **DETAILED** - Comprehensive financial model
|
|
- **Location**: `monetisation/financial-projections.md`
|
|
- **Details**:
|
|
- Year 1-3 revenue projections
|
|
- Unit economics (LTV/CAC)
|
|
- Cost structure
|
|
- Profitability timeline
|
|
- Cash flow projections
|
|
- **Gap**: None - comprehensive financial projections exist
|
|
|
|
**Files**:
|
|
- `monetisation/financial-projections.md` - Complete financial model
|
|
- `28_project_roadmap.md` - Budget breakdown
|
|
|
|
---
|
|
|
|
---
|
|
|
|
## ⚠️ PARTIALLY DOCUMENTED - Needs Enhancement
|
|
|
|
### 8. ✅ Environmental Impact Assessment (29% Required - for DBU, EIT programs)
|
|
**Status**: ✅ **COMPLETE** - Comprehensive environmental impact assessment created
|
|
- **Location**: `concept/impact/ENVIRONMENTAL_IMPACT_ASSESSMENT.md`
|
|
- **Application Summary**: `funding/application_documents/ENVIRONMENTAL_IMPACT_ASSESSMENT_SUMMARY.md`
|
|
- **Coverage**:
|
|
- ✅ **Quantified CO₂ emissions reduction**: 100,000 t CO₂ (Year 1) → 1,200,000 t CO₂ (Year 3)
|
|
- ✅ **Waste reduction methodology**: 50,000 t → 600,000 t diverted from landfill
|
|
- ✅ **Water conservation metrics**: 2.5 M m³ → 30 M m³ reused
|
|
- ✅ **Sustainability KPIs**: Material circularity rate, waste diversion rate, resource efficiency index
|
|
- ✅ **DBU #DBUcirconomy alignment**: Closing material loops, resource-efficient design, new circular business models
|
|
- ✅ **EU Green Deal alignment**: 1.8M t CO₂ avoided (3-year cumulative), supporting 55% emissions reduction target
|
|
- ✅ **Measurability plan**: Real-time tracking, monthly/quarterly reporting, annual assessments
|
|
- ✅ **Verification framework**: GHG Protocol compliant, ISO 14064 aligned, CSRD ready
|
|
|
|
**Files Created**:
|
|
- `concept/impact/ENVIRONMENTAL_IMPACT_ASSESSMENT.md` - Comprehensive assessment (detailed methodology, calculations, projections)
|
|
- `funding/application_documents/ENVIRONMENTAL_IMPACT_ASSESSMENT_SUMMARY.md` - Application-ready summary for funding programs
|
|
|
|
**Action Needed**: ✅ **Complete** - Ready for funding applications
|
|
|
|
---
|
|
|
|
### 9. ⚠️ Proof of Concept/Prototype (43% Required)
|
|
**Status**: ⚠️ **CONCEPTUAL** - Architecture defined, no working prototype
|
|
- **Location**: Technical architecture files
|
|
- **Existing Coverage**:
|
|
- Detailed technical architecture
|
|
- Schema definitions
|
|
- Algorithm descriptions
|
|
- Roadmap includes MVP plan
|
|
- References to prototype in roadmap
|
|
- **Gap**:
|
|
- ❌ **No working prototype exists yet** (planned for Month 1-3)
|
|
- ❌ **No proof of concept results/demo**
|
|
- ❌ **No test results/validation data**
|
|
- ❌ **No demo video or screenshots**
|
|
|
|
**Where Mentioned**:
|
|
- `28_project_roadmap.md` - MVP planned for Months 1-3
|
|
- `24_prototype_roadmap.md` - Prototype phases
|
|
- Technical architecture extensively documented
|
|
|
|
**Action Needed**:
|
|
- Build MVP/prototype before funding applications (or emphasize strong technical foundation)
|
|
- Document proof of concept results
|
|
- Create demo video/screenshots
|
|
- Gather preliminary test results
|
|
- For early applications: Emphasize strong technical foundation and detailed architecture
|
|
|
|
---
|
|
|
|
---
|
|
|
|
## ❌ MISSING - Needs to be Created
|
|
|
|
### 10. ❌ CVs of Key Team Members (100% Required)
|
|
**Status**: ❌ **MISSING** - No team CVs documented
|
|
- **Gap**:
|
|
- ❌ **No CVs of team members**
|
|
- ❌ **No team expertise summary**
|
|
- ❌ **No qualifications listed**
|
|
- ❌ **No previous project experience documented**
|
|
|
|
**Where Team is Mentioned**:
|
|
- `28_project_roadmap.md` - Team composition described:
|
|
- 8 engineers (4 backend, 2 frontend, 1 DevOps, 1 data)
|
|
- 2 domain experts
|
|
- 1 BD/sales
|
|
- No individual CVs or qualifications
|
|
|
|
**Action Needed**:
|
|
- Create CVs for all key team members (EU format preferred)
|
|
- Create team expertise summary document
|
|
- Highlight relevant experience (circular economy, innovation, industrial symbiosis)
|
|
- Include publications, patents, previous projects
|
|
- Create `TEAM_CVS.md` or individual CV files
|
|
|
|
---
|
|
|
|
### 11. ❌ Company Registration Documents (100% Required)
|
|
**Status**: ❌ **UNCLEAR** - Status unknown
|
|
- **Gap**:
|
|
- ❌ **Company registration status unclear** (planned in Month 1 roadmap)
|
|
- ❌ **No proof of Berlin location documented**
|
|
- ❌ **No company registration certificate**
|
|
- ❌ **No business registration number**
|
|
|
|
**Where Mentioned**:
|
|
- `28_project_roadmap.md` - "Legal entity formation and seed documents" mentioned in Month 1
|
|
- `00_introduction.md` - References Berlin-based company but no proof
|
|
|
|
**Action Needed**:
|
|
- Register company in Germany (if not done)
|
|
- Obtain company registration documents
|
|
- Document Berlin location/address
|
|
- Create `COMPANY_REGISTRATION.md` with all registration documents
|
|
|
|
**Note**: This is mentioned as Month 1 deliverable, so may be pending if company not yet formed.
|
|
|
|
---
|
|
|
|
### 12. ❌ Partnership/Consortium Agreements (50% Required - for Horizon Europe, CBE JU)
|
|
**Status**: ❌ **NOT DOCUMENTED** - Partnerships mentioned but no agreements
|
|
- **Gap**:
|
|
- ❌ **No consortium agreements documented** (needed for EU collaborative programs)
|
|
- ❌ **No letters of intent from partners**
|
|
- ❌ **No partnership agreements**
|
|
- ❌ **No research partner agreements**
|
|
|
|
**Where Partnerships Mentioned**:
|
|
- `28_project_roadmap.md` - Strategic partnerships planned
|
|
- `monetisation/go-to-market.md` - Utility partnerships mentioned
|
|
- Various files mention municipal partnerships, facilitator marketplace
|
|
|
|
**Action Needed** (For EU collaborative programs):
|
|
- Identify partners from different EU countries (if applying to Horizon Europe)
|
|
- Establish partnership agreements
|
|
- Get letters of support/intent
|
|
- Create `PARTNERSHIP_AGREEMENTS.md` document
|
|
- For single SME programs (EIC Accelerator): Not needed
|
|
|
|
---
|
|
|
|
---
|
|
|
|
## 📊 SUMMARY TABLE
|
|
|
|
| Requirement | Required By | Status | Gap Level | Priority |
|
|
|------------|------------|--------|-----------|----------|
|
|
| **Company Registration Documents** | 100% | ❌ Missing | **Critical** | **HIGH** |
|
|
| **Project Description** | 100% | ✅ Complete | None | - |
|
|
| **Budget Breakdown** | 100% | ✅ Documented | Minor (Excel format) | Medium |
|
|
| **CVs of Team Members** | 100% | ❌ Missing | **Critical** | **HIGH** |
|
|
| **Innovation Documentation** | 100% | ✅ Extensive | Minor (TRL assessment) | Low |
|
|
| **Market Analysis** | 86% | ✅ Complete | None | - |
|
|
| **Business Plan** | 86% | ✅ Well documented | Minor (consolidate) | Medium |
|
|
| **Project Timeline** | 86% | ✅ Detailed | Minor (Gantt chart) | Low |
|
|
| **Financial Projections** | 50% | ✅ Detailed | None | - |
|
|
| **Partnership Agreements** | 50% | ❌ Not documented | **High** (for EU collaborative) | **HIGH** (if EU collaborative) |
|
|
| **Proof of Concept** | 43% | ⚠️ Conceptual | **High** | **HIGH** |
|
|
| **Environmental Impact** | 29% | ⚠️ Partial | **Medium** | Medium |
|
|
|
|
---
|
|
|
|
## 🎯 ACTION PRIORITIES
|
|
|
|
### 🔴 CRITICAL (Must Prepare Before Applications)
|
|
|
|
1. **Company Registration Documents** (100% required)
|
|
- Register company in Germany (if not done)
|
|
- Obtain registration certificate
|
|
- Document Berlin address
|
|
- Create registration document folder
|
|
|
|
2. **CVs of Team Members** (100% required)
|
|
- Create CVs for all key team members (EU format)
|
|
- Create team expertise summary
|
|
- Highlight relevant experience
|
|
- Document previous projects
|
|
|
|
3. **Proof of Concept/Prototype** (43% required, but strengthens all applications)
|
|
- Build MVP/prototype (or emphasize strong technical foundation)
|
|
- Document test results
|
|
- Create demo video/screenshots
|
|
- Gather preliminary validation data
|
|
|
|
### 🟡 HIGH PRIORITY (Strengthen Applications)
|
|
|
|
4. **Partnership Agreements** (Required for EU collaborative programs)
|
|
- Identify partners if applying to Horizon Europe, CBE JU
|
|
- Get letters of support/intent
|
|
- Establish partnership agreements
|
|
- **Note**: Not needed for single SME programs (EIC Accelerator)
|
|
|
|
5. **Environmental Impact Assessment** (Required for DBU, some EIT programs)
|
|
- Create dedicated environmental impact document
|
|
- Quantify CO₂ emissions reduction
|
|
- Calculate waste reduction metrics
|
|
- Define sustainability KPIs
|
|
|
|
### 🟢 MEDIUM PRIORITY (Enhancement)
|
|
|
|
6. **Budget Excel Template**
|
|
- Convert budget breakdown to Excel format
|
|
- Add line items (personnel, equipment, subcontracting, travel, etc.)
|
|
- Make it funding-application ready
|
|
|
|
7. **Consolidated Business Plan**
|
|
- Create single 10-20 page business plan document
|
|
- Pull from all monetisation documents
|
|
- Format for funding applications
|
|
|
|
8. **Gantt Chart**
|
|
- Create visual Gantt chart of project timeline
|
|
- Show dependencies and milestones
|
|
- Useful for funding applications
|
|
|
|
9. **TRL Assessment**
|
|
- Create formal Technology Readiness Level assessment
|
|
- Document current TRL (likely 5-7)
|
|
- Show path to TRL 8-9
|
|
|
|
---
|
|
|
|
## 📝 RECOMMENDED DOCUMENT STRUCTURE
|
|
|
|
Create the following new documents/folders:
|
|
|
|
```
|
|
concept/
|
|
├── business/
|
|
│ ├── COMPANY_REGISTRATION.md (or folder with documents)
|
|
│ ├── TEAM_CVS.md (or team/ folder with individual CVs)
|
|
│ ├── PARTNERSHIP_AGREEMENTS.md (if needed for collaborative programs)
|
|
│ └── CONSOLIDATED_BUSINESS_PLAN.md (optional - pulls from monetisation/)
|
|
│
|
|
├── impact/
|
|
│ ├── ENVIRONMENTAL_IMPACT_ASSESSMENT.md
|
|
│ └── SUSTAINABILITY_METRICS.md
|
|
│
|
|
├── funding/
|
|
│ ├── BUDGET_BREAKDOWN.xlsx (Excel template)
|
|
│ ├── PROJECT_GANTT_CHART.png/pdf
|
|
│ ├── TRL_ASSESSMENT.md
|
|
│ └── PROOF_OF_CONCEPT.md (or folder with demo materials)
|
|
│
|
|
└── [existing files]
|
|
```
|
|
|
|
---
|
|
|
|
## 🚀 NEXT STEPS
|
|
|
|
1. **Immediate** (Week 1):
|
|
- Create `TEAM_CVS.md` with all team member CVs
|
|
- Verify/create `COMPANY_REGISTRATION.md` with registration documents
|
|
- Build minimal prototype/demo for proof of concept
|
|
|
|
2. **Short-term** (Week 2-3):
|
|
- Create `ENVIRONMENTAL_IMPACT_ASSESSMENT.md`
|
|
- Build Excel budget template
|
|
- Create Gantt chart visualization
|
|
- Document proof of concept results
|
|
|
|
3. **Before Applications** (Week 4+):
|
|
- Consolidate business plan if needed
|
|
- Get partnership letters if applying to collaborative programs
|
|
- Final review of all documents
|
|
- Format for specific funding program requirements
|
|
|
|
---
|
|
|
|
*This analysis was conducted on November 2025, comparing funding requirements from `COMMON_REQUIREMENTS.md` against existing project documentation in `concept/` directory.*
|
|
|