turash/funding/FUNDING_GAP_ANALYSIS.md
Damir Mukimov 4a2fda96cd
Initial commit: Repository setup with .gitignore, golangci-lint v2.6.0, and code quality checks
- Initialize git repository
- Add comprehensive .gitignore for Go projects
- Install golangci-lint v2.6.0 (latest v2) globally
- Configure .golangci.yml with appropriate linters and formatters
- Fix all formatting issues (gofmt)
- Fix all errcheck issues (unchecked errors)
- Adjust complexity threshold for validation functions
- All checks passing: build, test, vet, lint
2025-11-01 07:36:22 +01:00

15 KiB

Funding Application Gap Analysis

Overview

This document identifies gaps between funding application requirements (from COMMON_REQUIREMENTS.md) and existing project documentation in the concept/ directory. Use this to identify what needs to be prepared for funding applications.


DOCUMENTED - Ready for Funding Applications

1. Project Description (100% Required)

Status: COMPREHENSIVE - Well documented

  • Location: Multiple files covering all aspects
  • Technical Details: 03_core_concept_resource-matching_engine.md, 10_matching_engine_core_algorithm.md
  • Innovation Focus: Extensive documentation on graph-based matching, industrial symbiosis
  • Project Scope: 00_introduction.md, 05_system_overview.md
  • Gap: None - comprehensive project description exists

Files:

  • 00_introduction.md - Executive summary
  • 03_core_concept_resource-matching_engine.md - Core innovation
  • 05_system_overview.md - System overview
  • 10_matching_engine_core_algorithm.md - Technical innovation
  • Multiple technical architecture files

2. Budget Breakdown (100% Required)

Status: DOCUMENTED - Detailed budget in roadmap

  • Location: 28_project_roadmap.md
  • Details:
    • Total: €2.5M seed funding
    • Phase 1 (Months 1-3): €400k
    • Phase 2 (Months 4-6): Detailed breakdown
    • Infrastructure costs per month detailed
    • Team costs (8 engineers, 2 domain experts, 1 BD)
  • Gap: May need more granular Excel template format for funding applications

Files:

  • 28_project_roadmap.md - Detailed budget by phase
  • monetisation/financial-projections.md - Cost structure (Year 1-3)

Action Needed: Create Excel budget template with line items (personnel, equipment, subcontracting, travel, etc.)


3. Market Analysis (86% Required)

Status: COMPREHENSIVE - Excellent coverage

  • Location: 01_market_analysis.md
  • Details:
    • TAM/SAM/SOM analysis
    • Target customer segments
    • Geographic focus
    • Competitive landscape
    • Market validation framework
  • Gap: None - comprehensive market analysis exists

Files:

  • 01_market_analysis.md - Complete market analysis
  • 02_competitive_analysis.md - Competitive landscape
  • monetisation/competitive-analysis.md - Detailed competitive analysis

4. Business Plan (86% Required)

Status: WELL DOCUMENTED - Comprehensive business model

  • Location: monetisation/ directory
  • Details:
    • Revenue model (revenue-model.md)
    • Pricing strategy (pricing-strategy.md)
    • Go-to-market strategy (go-to-market.md)
    • Financial projections (financial-projections.md)
    • Unit economics (LTV/CAC)
  • Gap: May need consolidated single document format for some applications

Files:

  • 22_output_monetization.md - Overview (references monetisation/)
  • monetisation/revenue-model.md - Revenue streams
  • monetisation/financial-projections.md - Financial model
  • monetisation/go-to-market.md - Market strategy

Action Needed: Create single consolidated business plan document (10-20 pages) pulling from all sources


5. Project Timeline & Milestones (86% Required)

Status: DETAILED - Comprehensive roadmap

  • Location: 28_project_roadmap.md
  • Details:
    • 18-month roadmap with monthly milestones
    • Phase-by-phase breakdown
    • Deliverables per milestone
    • Success metrics
    • Technical dependencies
  • Gap: None - detailed timeline exists

Files:

  • 28_project_roadmap.md - 18-month detailed roadmap
  • 24_prototype_roadmap.md - High-level phases
  • monetisation/implementation-roadmap.md - Business implementation timeline

Action Needed: Create Gantt chart visualization for funding applications


6. Innovation Documentation (100% Required)

Status: EXTENSIVE - Well documented

  • Location: Multiple technical files
  • Details:
    • Graph-based matching engine innovation
    • Multi-resource matching algorithm
    • Hybrid Neo4j + PostGIS architecture
    • Technical novelty clearly described
    • Technology readiness level (TRL 5-8 mentioned)
  • Gap: May need formal TRL assessment document

Files:

  • 03_core_concept_resource-matching_engine.md - Core innovation
  • 10_matching_engine_core_algorithm.md - Algorithm details
  • 09_graph_database_design.md - Technical innovation
  • 11_technical_architecture_implementation.md - Implementation details

Action Needed: Create formal TRL (Technology Readiness Level) assessment document (currently TRL 5-8 range, need specific assessment)


7. Financial Projections (50% Required)

Status: DETAILED - Comprehensive financial model

  • Location: monetisation/financial-projections.md
  • Details:
    • Year 1-3 revenue projections
    • Unit economics (LTV/CAC)
    • Cost structure
    • Profitability timeline
    • Cash flow projections
  • Gap: None - comprehensive financial projections exist

Files:

  • monetisation/financial-projections.md - Complete financial model
  • 28_project_roadmap.md - Budget breakdown


⚠️ PARTIALLY DOCUMENTED - Needs Enhancement

8. Environmental Impact Assessment (29% Required - for DBU, EIT programs)

Status: COMPLETE - Comprehensive environmental impact assessment created

  • Location: concept/impact/ENVIRONMENTAL_IMPACT_ASSESSMENT.md
  • Application Summary: funding/application_documents/ENVIRONMENTAL_IMPACT_ASSESSMENT_SUMMARY.md
  • Coverage:
    • Quantified CO₂ emissions reduction: 100,000 t CO₂ (Year 1) → 1,200,000 t CO₂ (Year 3)
    • Waste reduction methodology: 50,000 t → 600,000 t diverted from landfill
    • Water conservation metrics: 2.5 M m³ → 30 M m³ reused
    • Sustainability KPIs: Material circularity rate, waste diversion rate, resource efficiency index
    • DBU #DBUcirconomy alignment: Closing material loops, resource-efficient design, new circular business models
    • EU Green Deal alignment: 1.8M t CO₂ avoided (3-year cumulative), supporting 55% emissions reduction target
    • Measurability plan: Real-time tracking, monthly/quarterly reporting, annual assessments
    • Verification framework: GHG Protocol compliant, ISO 14064 aligned, CSRD ready

Files Created:

  • concept/impact/ENVIRONMENTAL_IMPACT_ASSESSMENT.md - Comprehensive assessment (detailed methodology, calculations, projections)
  • funding/application_documents/ENVIRONMENTAL_IMPACT_ASSESSMENT_SUMMARY.md - Application-ready summary for funding programs

Action Needed: Complete - Ready for funding applications


9. ⚠️ Proof of Concept/Prototype (43% Required)

Status: ⚠️ CONCEPTUAL - Architecture defined, no working prototype

  • Location: Technical architecture files
  • Existing Coverage:
    • Detailed technical architecture
    • Schema definitions
    • Algorithm descriptions
    • Roadmap includes MVP plan
    • References to prototype in roadmap
  • Gap:
    • No working prototype exists yet (planned for Month 1-3)
    • No proof of concept results/demo
    • No test results/validation data
    • No demo video or screenshots

Where Mentioned:

  • 28_project_roadmap.md - MVP planned for Months 1-3
  • 24_prototype_roadmap.md - Prototype phases
  • Technical architecture extensively documented

Action Needed:

  • Build MVP/prototype before funding applications (or emphasize strong technical foundation)
  • Document proof of concept results
  • Create demo video/screenshots
  • Gather preliminary test results
  • For early applications: Emphasize strong technical foundation and detailed architecture


MISSING - Needs to be Created

10. CVs of Key Team Members (100% Required)

Status: MISSING - No team CVs documented

  • Gap:
    • No CVs of team members
    • No team expertise summary
    • No qualifications listed
    • No previous project experience documented

Where Team is Mentioned:

  • 28_project_roadmap.md - Team composition described:
    • 8 engineers (4 backend, 2 frontend, 1 DevOps, 1 data)
    • 2 domain experts
    • 1 BD/sales
  • No individual CVs or qualifications

Action Needed:

  • Create CVs for all key team members (EU format preferred)
  • Create team expertise summary document
  • Highlight relevant experience (circular economy, innovation, industrial symbiosis)
  • Include publications, patents, previous projects
  • Create TEAM_CVS.md or individual CV files

11. Company Registration Documents (100% Required)

Status: UNCLEAR - Status unknown

  • Gap:
    • Company registration status unclear (planned in Month 1 roadmap)
    • No proof of Berlin location documented
    • No company registration certificate
    • No business registration number

Where Mentioned:

  • 28_project_roadmap.md - "Legal entity formation and seed documents" mentioned in Month 1
  • 00_introduction.md - References Berlin-based company but no proof

Action Needed:

  • Register company in Germany (if not done)
  • Obtain company registration documents
  • Document Berlin location/address
  • Create COMPANY_REGISTRATION.md with all registration documents

Note: This is mentioned as Month 1 deliverable, so may be pending if company not yet formed.


12. Partnership/Consortium Agreements (50% Required - for Horizon Europe, CBE JU)

Status: NOT DOCUMENTED - Partnerships mentioned but no agreements

  • Gap:
    • No consortium agreements documented (needed for EU collaborative programs)
    • No letters of intent from partners
    • No partnership agreements
    • No research partner agreements

Where Partnerships Mentioned:

  • 28_project_roadmap.md - Strategic partnerships planned
  • monetisation/go-to-market.md - Utility partnerships mentioned
  • Various files mention municipal partnerships, facilitator marketplace

Action Needed (For EU collaborative programs):

  • Identify partners from different EU countries (if applying to Horizon Europe)
  • Establish partnership agreements
  • Get letters of support/intent
  • Create PARTNERSHIP_AGREEMENTS.md document
  • For single SME programs (EIC Accelerator): Not needed


📊 SUMMARY TABLE

Requirement Required By Status Gap Level Priority
Company Registration Documents 100% Missing Critical HIGH
Project Description 100% Complete None -
Budget Breakdown 100% Documented Minor (Excel format) Medium
CVs of Team Members 100% Missing Critical HIGH
Innovation Documentation 100% Extensive Minor (TRL assessment) Low
Market Analysis 86% Complete None -
Business Plan 86% Well documented Minor (consolidate) Medium
Project Timeline 86% Detailed Minor (Gantt chart) Low
Financial Projections 50% Detailed None -
Partnership Agreements 50% Not documented High (for EU collaborative) HIGH (if EU collaborative)
Proof of Concept 43% ⚠️ Conceptual High HIGH
Environmental Impact 29% ⚠️ Partial Medium Medium

🎯 ACTION PRIORITIES

🔴 CRITICAL (Must Prepare Before Applications)

  1. Company Registration Documents (100% required)

    • Register company in Germany (if not done)
    • Obtain registration certificate
    • Document Berlin address
    • Create registration document folder
  2. CVs of Team Members (100% required)

    • Create CVs for all key team members (EU format)
    • Create team expertise summary
    • Highlight relevant experience
    • Document previous projects
  3. Proof of Concept/Prototype (43% required, but strengthens all applications)

    • Build MVP/prototype (or emphasize strong technical foundation)
    • Document test results
    • Create demo video/screenshots
    • Gather preliminary validation data

🟡 HIGH PRIORITY (Strengthen Applications)

  1. Partnership Agreements (Required for EU collaborative programs)

    • Identify partners if applying to Horizon Europe, CBE JU
    • Get letters of support/intent
    • Establish partnership agreements
    • Note: Not needed for single SME programs (EIC Accelerator)
  2. Environmental Impact Assessment (Required for DBU, some EIT programs)

    • Create dedicated environmental impact document
    • Quantify CO₂ emissions reduction
    • Calculate waste reduction metrics
    • Define sustainability KPIs

🟢 MEDIUM PRIORITY (Enhancement)

  1. Budget Excel Template

    • Convert budget breakdown to Excel format
    • Add line items (personnel, equipment, subcontracting, travel, etc.)
    • Make it funding-application ready
  2. Consolidated Business Plan

    • Create single 10-20 page business plan document
    • Pull from all monetisation documents
    • Format for funding applications
  3. Gantt Chart

    • Create visual Gantt chart of project timeline
    • Show dependencies and milestones
    • Useful for funding applications
  4. TRL Assessment

    • Create formal Technology Readiness Level assessment
    • Document current TRL (likely 5-7)
    • Show path to TRL 8-9

Create the following new documents/folders:

concept/
├── business/
│   ├── COMPANY_REGISTRATION.md (or folder with documents)
│   ├── TEAM_CVS.md (or team/ folder with individual CVs)
│   ├── PARTNERSHIP_AGREEMENTS.md (if needed for collaborative programs)
│   └── CONSOLIDATED_BUSINESS_PLAN.md (optional - pulls from monetisation/)
│
├── impact/
│   ├── ENVIRONMENTAL_IMPACT_ASSESSMENT.md
│   └── SUSTAINABILITY_METRICS.md
│
├── funding/
│   ├── BUDGET_BREAKDOWN.xlsx (Excel template)
│   ├── PROJECT_GANTT_CHART.png/pdf
│   ├── TRL_ASSESSMENT.md
│   └── PROOF_OF_CONCEPT.md (or folder with demo materials)
│
└── [existing files]

🚀 NEXT STEPS

  1. Immediate (Week 1):

    • Create TEAM_CVS.md with all team member CVs
    • Verify/create COMPANY_REGISTRATION.md with registration documents
    • Build minimal prototype/demo for proof of concept
  2. Short-term (Week 2-3):

    • Create ENVIRONMENTAL_IMPACT_ASSESSMENT.md
    • Build Excel budget template
    • Create Gantt chart visualization
    • Document proof of concept results
  3. Before Applications (Week 4+):

    • Consolidate business plan if needed
    • Get partnership letters if applying to collaborative programs
    • Final review of all documents
    • Format for specific funding program requirements

This analysis was conducted on November 2025, comparing funding requirements from COMMON_REQUIREMENTS.md against existing project documentation in concept/ directory.