- Initialize git repository - Add comprehensive .gitignore for Go projects - Install golangci-lint v2.6.0 (latest v2) globally - Configure .golangci.yml with appropriate linters and formatters - Fix all formatting issues (gofmt) - Fix all errcheck issues (unchecked errors) - Adjust complexity threshold for validation functions - All checks passing: build, test, vet, lint
15 KiB
Funding Application Gap Analysis
Overview
This document identifies gaps between funding application requirements (from COMMON_REQUIREMENTS.md) and existing project documentation in the concept/ directory. Use this to identify what needs to be prepared for funding applications.
✅ DOCUMENTED - Ready for Funding Applications
1. ✅ Project Description (100% Required)
Status: ✅ COMPREHENSIVE - Well documented
- Location: Multiple files covering all aspects
- Technical Details:
03_core_concept_resource-matching_engine.md,10_matching_engine_core_algorithm.md - Innovation Focus: Extensive documentation on graph-based matching, industrial symbiosis
- Project Scope:
00_introduction.md,05_system_overview.md - Gap: None - comprehensive project description exists
Files:
00_introduction.md- Executive summary03_core_concept_resource-matching_engine.md- Core innovation05_system_overview.md- System overview10_matching_engine_core_algorithm.md- Technical innovation- Multiple technical architecture files
2. ✅ Budget Breakdown (100% Required)
Status: ✅ DOCUMENTED - Detailed budget in roadmap
- Location:
28_project_roadmap.md - Details:
- Total: €2.5M seed funding
- Phase 1 (Months 1-3): €400k
- Phase 2 (Months 4-6): Detailed breakdown
- Infrastructure costs per month detailed
- Team costs (8 engineers, 2 domain experts, 1 BD)
- Gap: May need more granular Excel template format for funding applications
Files:
28_project_roadmap.md- Detailed budget by phasemonetisation/financial-projections.md- Cost structure (Year 1-3)
Action Needed: Create Excel budget template with line items (personnel, equipment, subcontracting, travel, etc.)
3. ✅ Market Analysis (86% Required)
Status: ✅ COMPREHENSIVE - Excellent coverage
- Location:
01_market_analysis.md - Details:
- TAM/SAM/SOM analysis
- Target customer segments
- Geographic focus
- Competitive landscape
- Market validation framework
- Gap: None - comprehensive market analysis exists
Files:
01_market_analysis.md- Complete market analysis02_competitive_analysis.md- Competitive landscapemonetisation/competitive-analysis.md- Detailed competitive analysis
4. ✅ Business Plan (86% Required)
Status: ✅ WELL DOCUMENTED - Comprehensive business model
- Location:
monetisation/directory - Details:
- Revenue model (
revenue-model.md) - Pricing strategy (
pricing-strategy.md) - Go-to-market strategy (
go-to-market.md) - Financial projections (
financial-projections.md) - Unit economics (LTV/CAC)
- Revenue model (
- Gap: May need consolidated single document format for some applications
Files:
22_output_monetization.md- Overview (references monetisation/)monetisation/revenue-model.md- Revenue streamsmonetisation/financial-projections.md- Financial modelmonetisation/go-to-market.md- Market strategy
Action Needed: Create single consolidated business plan document (10-20 pages) pulling from all sources
5. ✅ Project Timeline & Milestones (86% Required)
Status: ✅ DETAILED - Comprehensive roadmap
- Location:
28_project_roadmap.md - Details:
- 18-month roadmap with monthly milestones
- Phase-by-phase breakdown
- Deliverables per milestone
- Success metrics
- Technical dependencies
- Gap: None - detailed timeline exists
Files:
28_project_roadmap.md- 18-month detailed roadmap24_prototype_roadmap.md- High-level phasesmonetisation/implementation-roadmap.md- Business implementation timeline
Action Needed: Create Gantt chart visualization for funding applications
6. ✅ Innovation Documentation (100% Required)
Status: ✅ EXTENSIVE - Well documented
- Location: Multiple technical files
- Details:
- Graph-based matching engine innovation
- Multi-resource matching algorithm
- Hybrid Neo4j + PostGIS architecture
- Technical novelty clearly described
- Technology readiness level (TRL 5-8 mentioned)
- Gap: May need formal TRL assessment document
Files:
03_core_concept_resource-matching_engine.md- Core innovation10_matching_engine_core_algorithm.md- Algorithm details09_graph_database_design.md- Technical innovation11_technical_architecture_implementation.md- Implementation details
Action Needed: Create formal TRL (Technology Readiness Level) assessment document (currently TRL 5-8 range, need specific assessment)
7. ✅ Financial Projections (50% Required)
Status: ✅ DETAILED - Comprehensive financial model
- Location:
monetisation/financial-projections.md - Details:
- Year 1-3 revenue projections
- Unit economics (LTV/CAC)
- Cost structure
- Profitability timeline
- Cash flow projections
- Gap: None - comprehensive financial projections exist
Files:
monetisation/financial-projections.md- Complete financial model28_project_roadmap.md- Budget breakdown
⚠️ PARTIALLY DOCUMENTED - Needs Enhancement
8. ✅ Environmental Impact Assessment (29% Required - for DBU, EIT programs)
Status: ✅ COMPLETE - Comprehensive environmental impact assessment created
- Location:
concept/impact/ENVIRONMENTAL_IMPACT_ASSESSMENT.md - Application Summary:
funding/application_documents/ENVIRONMENTAL_IMPACT_ASSESSMENT_SUMMARY.md - Coverage:
- ✅ Quantified CO₂ emissions reduction: 100,000 t CO₂ (Year 1) → 1,200,000 t CO₂ (Year 3)
- ✅ Waste reduction methodology: 50,000 t → 600,000 t diverted from landfill
- ✅ Water conservation metrics: 2.5 M m³ → 30 M m³ reused
- ✅ Sustainability KPIs: Material circularity rate, waste diversion rate, resource efficiency index
- ✅ DBU #DBUcirconomy alignment: Closing material loops, resource-efficient design, new circular business models
- ✅ EU Green Deal alignment: 1.8M t CO₂ avoided (3-year cumulative), supporting 55% emissions reduction target
- ✅ Measurability plan: Real-time tracking, monthly/quarterly reporting, annual assessments
- ✅ Verification framework: GHG Protocol compliant, ISO 14064 aligned, CSRD ready
Files Created:
concept/impact/ENVIRONMENTAL_IMPACT_ASSESSMENT.md- Comprehensive assessment (detailed methodology, calculations, projections)funding/application_documents/ENVIRONMENTAL_IMPACT_ASSESSMENT_SUMMARY.md- Application-ready summary for funding programs
Action Needed: ✅ Complete - Ready for funding applications
9. ⚠️ Proof of Concept/Prototype (43% Required)
Status: ⚠️ CONCEPTUAL - Architecture defined, no working prototype
- Location: Technical architecture files
- Existing Coverage:
- Detailed technical architecture
- Schema definitions
- Algorithm descriptions
- Roadmap includes MVP plan
- References to prototype in roadmap
- Gap:
- ❌ No working prototype exists yet (planned for Month 1-3)
- ❌ No proof of concept results/demo
- ❌ No test results/validation data
- ❌ No demo video or screenshots
Where Mentioned:
28_project_roadmap.md- MVP planned for Months 1-324_prototype_roadmap.md- Prototype phases- Technical architecture extensively documented
Action Needed:
- Build MVP/prototype before funding applications (or emphasize strong technical foundation)
- Document proof of concept results
- Create demo video/screenshots
- Gather preliminary test results
- For early applications: Emphasize strong technical foundation and detailed architecture
❌ MISSING - Needs to be Created
10. ❌ CVs of Key Team Members (100% Required)
Status: ❌ MISSING - No team CVs documented
- Gap:
- ❌ No CVs of team members
- ❌ No team expertise summary
- ❌ No qualifications listed
- ❌ No previous project experience documented
Where Team is Mentioned:
28_project_roadmap.md- Team composition described:- 8 engineers (4 backend, 2 frontend, 1 DevOps, 1 data)
- 2 domain experts
- 1 BD/sales
- No individual CVs or qualifications
Action Needed:
- Create CVs for all key team members (EU format preferred)
- Create team expertise summary document
- Highlight relevant experience (circular economy, innovation, industrial symbiosis)
- Include publications, patents, previous projects
- Create
TEAM_CVS.mdor individual CV files
11. ❌ Company Registration Documents (100% Required)
Status: ❌ UNCLEAR - Status unknown
- Gap:
- ❌ Company registration status unclear (planned in Month 1 roadmap)
- ❌ No proof of Berlin location documented
- ❌ No company registration certificate
- ❌ No business registration number
Where Mentioned:
28_project_roadmap.md- "Legal entity formation and seed documents" mentioned in Month 100_introduction.md- References Berlin-based company but no proof
Action Needed:
- Register company in Germany (if not done)
- Obtain company registration documents
- Document Berlin location/address
- Create
COMPANY_REGISTRATION.mdwith all registration documents
Note: This is mentioned as Month 1 deliverable, so may be pending if company not yet formed.
12. ❌ Partnership/Consortium Agreements (50% Required - for Horizon Europe, CBE JU)
Status: ❌ NOT DOCUMENTED - Partnerships mentioned but no agreements
- Gap:
- ❌ No consortium agreements documented (needed for EU collaborative programs)
- ❌ No letters of intent from partners
- ❌ No partnership agreements
- ❌ No research partner agreements
Where Partnerships Mentioned:
28_project_roadmap.md- Strategic partnerships plannedmonetisation/go-to-market.md- Utility partnerships mentioned- Various files mention municipal partnerships, facilitator marketplace
Action Needed (For EU collaborative programs):
- Identify partners from different EU countries (if applying to Horizon Europe)
- Establish partnership agreements
- Get letters of support/intent
- Create
PARTNERSHIP_AGREEMENTS.mddocument - For single SME programs (EIC Accelerator): Not needed
📊 SUMMARY TABLE
| Requirement | Required By | Status | Gap Level | Priority |
|---|---|---|---|---|
| Company Registration Documents | 100% | ❌ Missing | Critical | HIGH |
| Project Description | 100% | ✅ Complete | None | - |
| Budget Breakdown | 100% | ✅ Documented | Minor (Excel format) | Medium |
| CVs of Team Members | 100% | ❌ Missing | Critical | HIGH |
| Innovation Documentation | 100% | ✅ Extensive | Minor (TRL assessment) | Low |
| Market Analysis | 86% | ✅ Complete | None | - |
| Business Plan | 86% | ✅ Well documented | Minor (consolidate) | Medium |
| Project Timeline | 86% | ✅ Detailed | Minor (Gantt chart) | Low |
| Financial Projections | 50% | ✅ Detailed | None | - |
| Partnership Agreements | 50% | ❌ Not documented | High (for EU collaborative) | HIGH (if EU collaborative) |
| Proof of Concept | 43% | ⚠️ Conceptual | High | HIGH |
| Environmental Impact | 29% | ⚠️ Partial | Medium | Medium |
🎯 ACTION PRIORITIES
🔴 CRITICAL (Must Prepare Before Applications)
-
Company Registration Documents (100% required)
- Register company in Germany (if not done)
- Obtain registration certificate
- Document Berlin address
- Create registration document folder
-
CVs of Team Members (100% required)
- Create CVs for all key team members (EU format)
- Create team expertise summary
- Highlight relevant experience
- Document previous projects
-
Proof of Concept/Prototype (43% required, but strengthens all applications)
- Build MVP/prototype (or emphasize strong technical foundation)
- Document test results
- Create demo video/screenshots
- Gather preliminary validation data
🟡 HIGH PRIORITY (Strengthen Applications)
-
Partnership Agreements (Required for EU collaborative programs)
- Identify partners if applying to Horizon Europe, CBE JU
- Get letters of support/intent
- Establish partnership agreements
- Note: Not needed for single SME programs (EIC Accelerator)
-
Environmental Impact Assessment (Required for DBU, some EIT programs)
- Create dedicated environmental impact document
- Quantify CO₂ emissions reduction
- Calculate waste reduction metrics
- Define sustainability KPIs
🟢 MEDIUM PRIORITY (Enhancement)
-
Budget Excel Template
- Convert budget breakdown to Excel format
- Add line items (personnel, equipment, subcontracting, travel, etc.)
- Make it funding-application ready
-
Consolidated Business Plan
- Create single 10-20 page business plan document
- Pull from all monetisation documents
- Format for funding applications
-
Gantt Chart
- Create visual Gantt chart of project timeline
- Show dependencies and milestones
- Useful for funding applications
-
TRL Assessment
- Create formal Technology Readiness Level assessment
- Document current TRL (likely 5-7)
- Show path to TRL 8-9
📝 RECOMMENDED DOCUMENT STRUCTURE
Create the following new documents/folders:
concept/
├── business/
│ ├── COMPANY_REGISTRATION.md (or folder with documents)
│ ├── TEAM_CVS.md (or team/ folder with individual CVs)
│ ├── PARTNERSHIP_AGREEMENTS.md (if needed for collaborative programs)
│ └── CONSOLIDATED_BUSINESS_PLAN.md (optional - pulls from monetisation/)
│
├── impact/
│ ├── ENVIRONMENTAL_IMPACT_ASSESSMENT.md
│ └── SUSTAINABILITY_METRICS.md
│
├── funding/
│ ├── BUDGET_BREAKDOWN.xlsx (Excel template)
│ ├── PROJECT_GANTT_CHART.png/pdf
│ ├── TRL_ASSESSMENT.md
│ └── PROOF_OF_CONCEPT.md (or folder with demo materials)
│
└── [existing files]
🚀 NEXT STEPS
-
Immediate (Week 1):
- Create
TEAM_CVS.mdwith all team member CVs - Verify/create
COMPANY_REGISTRATION.mdwith registration documents - Build minimal prototype/demo for proof of concept
- Create
-
Short-term (Week 2-3):
- Create
ENVIRONMENTAL_IMPACT_ASSESSMENT.md - Build Excel budget template
- Create Gantt chart visualization
- Document proof of concept results
- Create
-
Before Applications (Week 4+):
- Consolidate business plan if needed
- Get partnership letters if applying to collaborative programs
- Final review of all documents
- Format for specific funding program requirements
This analysis was conducted on November 2025, comparing funding requirements from COMMON_REQUIREMENTS.md against existing project documentation in concept/ directory.