turash/docs/business/funding/PREPARATION_PRIORITY.md
Damir Mukimov 000eab4740
Major repository reorganization and missing backend endpoints implementation
Repository Structure:
- Move files from cluttered root directory into organized structure
- Create archive/ for archived data and scraper results
- Create bugulma/ for the complete application (frontend + backend)
- Create data/ for sample datasets and reference materials
- Create docs/ for comprehensive documentation structure
- Create scripts/ for utility scripts and API tools

Backend Implementation:
- Implement 3 missing backend endpoints identified in gap analysis:
  * GET /api/v1/organizations/{id}/matching/direct - Direct symbiosis matches
  * GET /api/v1/users/me/organizations - User organizations
  * POST /api/v1/proposals/{id}/status - Update proposal status
- Add complete proposal domain model, repository, and service layers
- Create database migration for proposals table
- Fix CLI server command registration issue

API Documentation:
- Add comprehensive proposals.md API documentation
- Update README.md with Users and Proposals API sections
- Document all request/response formats, error codes, and business rules

Code Quality:
- Follow existing Go backend architecture patterns
- Add proper error handling and validation
- Match frontend expected response schemas
- Maintain clean separation of concerns (handler -> service -> repository)
2025-11-25 06:01:16 +01:00

3.6 KiB

Funding Application Preparation Priority

Date: November 2025
Focus: Common requirements for ALL 5 priority funding applications


Starting Point: What ALL Programs Need (100% Required)

Based on the analysis, ALL 5 programs require these documents. Here's the recommended order to prepare them:


🎯 Priority 1: CVs of Key Team Members

Why Start Here:

  • 100% required by all 5 programs
  • Can be created immediately (no dependencies)
  • Blocks nothing - can work in parallel with other tasks
  • Foundation for demonstrating team capability

What We Need:

  1. CVs for each key team member (EU format preferred)
  2. Team expertise summary document
  3. Highlight relevant experience (circular economy, innovation, industrial symbiosis)

Status: Based on roadmap (Month 1), team composition is:

  • 8 engineers (4 backend, 2 frontend, 1 DevOps, 1 data)
  • 2 domain experts
  • 1 BD/sales

Action:

  • Create CV template (EU format)
  • Create team expertise summary template
  • Document previous projects and qualifications

🎯 Priority 2: Company Registration Documents

Why Second:

  • 100% required by all 5 programs
  • ⚠️ May need legal work if not already registered
  • ⚠️ Blocks all applications if missing
  • Can verify status immediately

What We Need:

  • German company registration certificate
  • Proof of permanent establishment in Germany (Berlin address)
  • Business registration number
  • Registration document folder

Status: Roadmap mentions "Legal entity formation and seed documents" in Month 1

Action:

  1. Verify if company is already registered in Germany
  2. If registered: Gather all registration documents
  3. If not registered: Start registration process (may take 1-4 weeks)
  4. Document Berlin address/proof of location

🎯 Priority 3: Budget Excel Template

Why Third:

  • 100% required by all 5 programs
  • Can be created immediately (existing budget data available)
  • Quick win - transforms existing documentation
  • Needed for all applications

What We Need:

  • Excel budget template with line items:
    • Personnel costs
    • Equipment
    • Subcontracting
    • Travel
    • Other direct costs
  • Cost allocation by work package/activity
  • Funding request amount breakdown

Status: Budget breakdown exists in 28_project_roadmap.md - needs Excel format

Action:

  • Create Excel template based on existing budget
  • Add required line items for funding applications
  • Format for all 5 programs

Week 1: Foundation Documents (All Programs)

  1. Day 1-2: CVs

    • Create CV template (EU format)
    • Create team expertise summary
    • Document relevant experience
  2. Day 3-4: Company Registration

    • Verify registration status
    • Gather/obtain documents
    • Document Berlin address
  3. Day 5: Budget Excel Template

    • Create Excel template
    • Transfer existing budget data
    • Format for applications

Week 2: Program-Specific Preparation

  1. EIC Accelerator Short Application (Priority: Highest)

    • Pitch deck (10 slides)
    • Video pitch (3 minutes)
  2. ZIM Application

    • Full project proposal
    • R&D component documentation

Immediate Next Steps

Let's start with Priority 1: CVs

I can:

  1. Create a CV template (EU format) for team members
  2. Create a team expertise summary template
  3. Create a checklist for what to include in each CV

This will unblock all 5 applications and can be done immediately.

Would you like me to:

  • Create the CV template?
  • Create the team expertise summary template?
  • Start with verifying company registration status?